Offshore Windfarm Wireless Load Monitoring

July 22, 2014

The system monitors the Load using a Tensile Load Link or Load Pin mounted on/in a sheave block connected to the pull-in Winch cable.

A local rugged display enclosed in a Peli case was used to display the load on the offshore platform, which has a wireless link to a slave display designed to be mounted on the cable laying vessel.

The system was designed complete with an audible alarm on the Peli display, RS232/RS485 retransmission options on the slave display and also a “bolt-on” Data logger option offering the ability to log data over time and view load trends in graphical format.

Our case studies

Grapnel Train

DLM’s Complete Grapnel Train Solutions

Posted on June 4, 2025

The Challenge: Selecting the most effective combination of grapnels for specific seabed conditions has long been a challenging and time-consuming process for companies involved in…

Read more
Long Line Cutter

DLM’s Long Line Cutter: Protecting Subsea Cables

Posted on October 3, 2024

The Long Line Cutter has become an essential part of any cable-laying project toolkit, and we now keep limited stock at DLM HQ.

Read more

Saddleback Holdback Tensioner for Subsea Cable

Posted on January 7, 2022

Dynamic Load Monitoring (UK) Ltd. (DLM), of Southampton, UK has expanded its already extensive range of line tension measurement technology, with a new device for…

Read more
View all case studies